Vacuum pouring equipment

News

Keywords

Contact us

Shenyang zhongzhen tuoda technology co. LTD

Address: new civil law hanniu industrial park, shenyang city, liaoning province 221

Telephone: 024-87704056

Fax: 024-87705459

Email address: sytdvac@126.com

Phone: 13904029788

Website: www.tdvac.com

Operation of vacuum dryer before operation

Your current location: Home >> News >> Industry News

Operation of vacuum dryer before operation

Published: 2018-06-20 Author: Clicks:

Operation of vacuum dryer before operation

1) clean the drying tank and keep the tank clean.

2) refer to the instructions of the vacuum pump to conduct a careful examination of the vacuum pump. Whether there is a serious emulsification phenomenon by observing the adequacy of the pump oil in the vacuum gauge.

3) check whether the circulating pipeline of heat conducting oil is clear, and whether the cut-off valve before and after the heat conduction oil circulating pump is opened.

4) check whether the oil level in the expansion tank is normal.

5) check condensers and condensate tanks in liquid containers and remove them if necessary.

6) check whether the power, water and gas source needed for the operation of the equipment are normal.

7) check whether the numbers of the instruments are normal.

The content of the article comes from the Internet. If there are any questions, please contact us.

Vacuum dryer

Vacuum dryer

This article URL: http://www.tdvac.com/en/news/399.html

Keywords: Vacuumdryer

Recently Viewed:

  • Service
  • Telephone
    13904029788
  • Message
  • 在线咨询